Construction Monitoring of Dukeng Bridge
Abstract:
In this paper, a continuous beam arch bridge Dukeng bridge was introduced. Its construction process and its construction monitoring were discussed. In the construction process, the elevations of the box girders measured were closer to the values theoretical calculated. Though construction monitoring, although there were some construction errors, they can be timely adjusted and rectified and the main beam was ensure to smoothly closure.