Study on the Election of Construction Schemes for the Entrance Segment of Tunnel with Unsymmetrical Loading through Large-Span Thin-Dover

Article Preview

Abstract:

Jiulian-mountain tunnel is an very important project for a section of Longyang Jiangxi in Da-guang highway. Because Jiulian-montain tunnel has a series of geological problems, like shallow-depth, bias-pressure, big-span,water-rich, rock burst and so on, which is a typical long - wide highway tunnel grew up under complex conditions, construction of the entrance segment is extremely difficult and slow in progress.In order to efficiently accomplish the construction of tunnel on time, it is necessory to elect rational construction scheme of the entrance segment. The numerical simulation for three construction methods,which are benching tunneling method、 method of core-keeping cut in stages and CD method , are carried out by means of Three-dimensional fast lagrangian analysis of continua method(FLAC3D) in this paper. Based on the result of the numerical simulation analysis and contrast, some conclusions and suggestions are proposed, some gist are offered in order to choose the construction method rationally ,and arrange the construction order scientifically, and control the construction pace optimally, and reduce the harm of the construction .

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

1831-1837

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] The ministry of communication highway tunnel design standard(bejing.people,s traffic press,China 2004). (in chinese)

Google Scholar

[2] Jianhua Yang, Bin Zhu: Journal of xi an University of Science and Technology.Vol. 31(3)(2011),pp.287-292.(in chinese)

Google Scholar

[3] Guyue Chen: West-china Exploration Engineering .Vol. (10)(2005) ,pp.120-122. (in chinese)

Google Scholar

[4] Boyang Ding, Junjie Wang: Journal of Zhejiang University of Technology. Vol. 38(6)(2010) ,pp.633-637. (in chinese)

Google Scholar

[5] Shugang Wang,Shucai Li,Gang Wang, Xianggang Wang, Gun jin Lin:Rock and Soil Mechanics. Vol. 27(2006) ,pp.364-368. (in chinese)

Google Scholar

[6] Wenxue Gao ,Wenlong Shun,Wenxu ZHOU, Ping Fu,Hongliang Deng,Yang-yang Zhang: Construction Technology. Vol. 40(3)(2011) ,pp.48-50. (in chinese)

Google Scholar

[7] Jianlong Ding: China Railway Science .Vol.26(4)(2005) ,pp.77-81. (in chinese)

Google Scholar

[8] Min Zhang: Journal of Railway Engineering Society .Vol.(2)(2007) ,pp.69-73. (in chinese)

Google Scholar