p.2168
p.2172
p.2177
p.2182
p.2186
p.2192
p.2196
p.2202
p.2206
Construction Process Numerical Simulation and Experimental Research of Parallel-Adjacent Loess Tunnel
Abstract:
According to the mechanical properties of the parallel-adjective tunnel, the construction process is simulated and the displacements and concrete stress of the lining structure is monitored of an actual tunnel in the loess region. The influence which the new tunnel on the existing tunnel lining during the new tunnel construction process studied by comparatively analyzed the numerical simulation and monitoring the results. The results show that the impact on the existing tunnel during the new tunnel excavation changes with tunnel distance and the excavation method of the new tunnel, when the line distance increases the impact on the existing tunnel has been remarkably reduced.
Info:
Periodical:
Pages:
2186-2191
Citation:
Online since:
January 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: