Abstract:

A viaduct of the Qinglai expressway fourth contract was artificial excavated piles. The construction technical work was regarded as an example. The technical comparison were done between the artificial excavated pile and the bored pile on the pile foundation bearing capacity and the retaining wall effect . The artificial excavated pile replacing the bored pile was feasible, and the construction technology and the key problems of the artificial excavated piles were confirmed. The references were provided to the similar projects.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

2449-2452

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zixian SU: East China Highway ,Vol. 2(2007), In chinese.

Google Scholar

[2] The Construction Experiences of New Technologies from Exchange Meeting(2008), In chinese.

Google Scholar

[3] JTG D63-2007: Code for Design of Ground Base and Foundation of Highway Bridge and Culverts(China Communications Press,China 2007).

Google Scholar

[4] Qixia LIU: Special Foundation Engineering, China Machine Press(2008), p.79, p.125.

Google Scholar

[5] Yumin LIU: geotechnical engineeringVol. 6(2006), In chinese.

Google Scholar

[6] JTG/T F50-2011:Technical specifications for construction of Highway Bridges and culverts (China Communications Press,China 2011).

Google Scholar

[7] Mei CHEN:Engineering construction ,Vol. 6(2008), In chinese.

Google Scholar