p.3062
p.3066
p.3072
p.3076
p.3083
p.3087
p.3092
p.3096
p.3100
Cost Estimation Method of Post-Earthquake Rehabilitation of Power System
Abstract:
Power system related to the people's livelihood is an important lifeline and its rapid post-earthquake rehabilitation and reconstruction is particularly important. Considering the importance of power system, cost estimation method of post-earthquake rehabilitation of power system is proposed. Based on the direct economic losses of power system, post-earthquake rehabilitation cost is given by index of the post-earthquake adjustment factor which is put forward according to post-earthquake rehabilitation cost and direct economic losses of power system in “5.12” Wenchuan earthquake. Cost estimation method of post-earthquake rehabilitation of power system could provide good suggestions for post-earthquake rehabilitation work.
Info:
Periodical:
Pages:
3083-3086
Citation:
Online since:
January 2012
Authors:
Keywords:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: