Numerical Simulation of Subway Station Constructed Using Top-Down Method

Article Preview

Abstract:

This paper mainly deals with the stress and deformation behavior of the subway station structure during the excavation, the construction of the station constructed using top-down method is simulated with ANSYS. The research results show that the diaphragm wall, column and horizontal plate uplift and sink alternately under the influence of foundation rebound, gravity and construction load. Under the influence of lateral soil pressure and horizontal plate, the horizontal deformation curves of the diaphragm wall is similar to bow at first and then to s shape. The huge horizontal stiffness of the plate can control the horizontal deformation of the diaphragm wall effectively. The most disadvantageous positions of internal force in each condition are shown finally, and the results can be referenced by similar engineering.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

3757-3761

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wang Yuanxiang, Application of Cover-and-Cut Reverse Construction Method to Metro Engineering in China, China Civil Engineering Journal, 1996, 29(1), p.3~14,(In Chinese)

Google Scholar

[2] Liu Changyong, Gao Qiang, Analysis of Top-Down Inverse Construction Method for a Subway Station, Tunnel and Underground Engineering, 2010, 28(1), p, 95~98,(In Chinese)

Google Scholar

[3] Zhang Jianxin, Liu Shuangju, Zhou Jiabin, Analysis of influence of foundation pits excavation unloading by top-down method on engineering structures, Rock and Soil Mechanics, 2010, 31(2), p.218~223,(In Chinese)

Google Scholar

[4] Su Jie, Zhang Dingli, Gao Ziyou, Huang Jun, Xiao Congmiao, Structural Deformation and Control of Subway Station Constructed by Cut and Cover Reverse Method, China Railway Science, 2010, 31(1), p, 59~65, (In Chinese)

Google Scholar

[5] Chang-Yu Ou, Jui-Tang liao, Horn-Da lin, Performance of Diaphragm Wall Constructed Using Top-Down Method, Journal of geotechnical and geoenvironmental engineering, 1998, p, 798~808

DOI: 10.1061/(asce)1090-0241(1998)124:9(798)

Google Scholar

[6] Xu Fanli, Cui Jinghao, A Mechanics Analysis on Subway Station constructed by Top-Down Method, Engineering Mechanics, 1995, p, 2152~2157, (In Chinese)

Google Scholar