Technical and Economic Analysis of BIPV Project in a University Campus of Beijing
Abstract:
The campus building-integrated photovoltaic project is introduced in the paper. The installed gross power of the PV system is 470 KW, and its generation index is 173.7 KWh/m2.Compared with the traditional municipal power supply, the unit incremental cost of photovoltaic is 53.5 RMB/W and the cost effectiveness ratio is 1.75 RMB/KWh. However utilization of PV system will save fossil energy, lower pollutions and greenhouse gases obviously.