Study and Engineering Practice on Cracks Control Measures for Concrete Face Slab of High CFRD

Article Preview

Abstract:

Being the face slabs of high concrete faced rockfill dams (CFRD) are under complex stress state, the slabs are relative vulnerable. And crack is easy to form on slab, which can influence durability and integrity, then weaken impermeable ability and safety of dam. The factors that contribute to the structural cracks, non-structural cracks and extruding cracks of concrete face-slab are analyzed in detail. The result shows that the structural crack is mainly due to differential settlement, the extruding crack in riverbed position is mainly caused by rockfill body over-settlement of dam beyond 150m high and the non-structural crack is mainly caused by temperature shrinkage and air shrinkage. Therefore, crack control of CFRD face slab should be regulated by the three means coming from structural design, construction control and concrete material. It is proved by the practices in Shuibuya CFRD that face slab cracks on CFRD beyond 200m high can be reduced effectually by the present technique means.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 455-456)

Pages:

1606-1611

Citation:

Online since:

January 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Concrete Faced Rockfill Dams, 2008. Hydropower & Dams World Atlas, (2008).

Google Scholar

[2] Xu Zeping, Key Technical Problems on the Construction of Super-high CFRD , Water Power, 2010(1), pp.51-53, 59.

Google Scholar

[3] Lei Jinsheng, Zhang Zhenhua, Cai Qilong, Analysis on key problems in design of transit on slope with angle of repose for colluvial deposit, Water Resources and Hydropower Engineering, vol. 40(11), 2009, pp.15-18.

Google Scholar

[4] Lin Rongzhang, Wu Yuewei, Xu Rulin, Cai Wei, Wang Jianbin, On cracking treatment technique for facing concrete of concrete faced rockfill dam of Shuibuya Hydropower Station, Water Resources and Hydropower Engineering, vol. 38(11), 2007, pp.71-75.

Google Scholar

[5] Xu Zeping, Guo Chen, Research on the Concrete Face Slab Rupture of High CFRD, Water Power, 33(9), 2007, pp.80-84.

Google Scholar

[6] Zhou Hougui, New construction technology for Shuibuya Concrete Faced Rockfill Dam, Hubei Water Power, 2009(1), pp.24-27.

Google Scholar

[7] Liang Tinghao, Li Linlu, Zhang Yuqing, Liu Yixiang, Zhang Jingjing, He Bei, Research on anti-cracking ability of polyacrylonitrile fiber reinforced marine concrete, , Concrete, 2010(11), pp.43-46.

Google Scholar

[8] Xu Ang ang, Chen Heyong, Determination of Fly Ash in Concrete of Some Workshop in Hydropower Station, vol 39(6), 2010, pp.31-32, 43.

Google Scholar

[9] Song Wenjing, Sun Yi, Li Liang, Wang Yunqing, Reason analysis and treatment for the 1st phase slab cracking of Shuibuya CFRD, Journal of Hydroelectric Engineering, vol 27(3), 2008, pp.33-37.

Google Scholar

[10] Sobrinho, Jose Antunes ; da Cunha, Joaquim C, ITA dam - selection of type, Concrete Face Rockfill Dams - Design, Construction, and Performance, Detroit, MI, Engl, 1985, pp.601-607.

Google Scholar