Numerical Simulation of the Nuclear Main Pump in the Sbloca

Article Preview

Abstract:

In this paper, the transient of the flow field of the nuclear main pump has been analyzed in the SBLOCA and the half mass flow rate time is obtained through the simulation. The results of the simulation show that, as nuclear main pump runs down, the mass flow rate and head of the pump drops as well. The blade surface pressure is not evenly distributed. The blade bears the force of the flow. So Pump unit should have sufficient moment of inertia, so that when the reactor in an emergency shuts down caused by the failure of power supply, nucleate burning down can be avoided by cooling the core. On the braking operation condition, the half mass flow rate time required should be guaranteed. Through simulation, we find when the half time is equal to 10s, the half mass flow rate time is about 4.6s Though it is a little shorter than 5s required, the AP1000 model selected basically meet the idle requirement.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 455-456)

Pages:

314-319

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Runbing Zhou, Fengchen Li, Guohua Xu. Experimental Researchs on PWR cold pipe of 1% small break loss of coolant accident, , Atomic Energy Science and Technology, China, vol. 32, p.9–15, April (1998).

Google Scholar

[2] Liang Li, Hydraulic Model of AP1000 reactor pump for coolant, , unpublished.

Google Scholar

[3] Xiajie Liu, Flow and Vibration Characteristic Research of Nuclear Main Pump under Station Blackout Accident, Nuclear Power Engineering. Chian, vol. 2, p.29–51, Febr. April (2009).

Google Scholar

[4] Xipeng Ma, Discussion on Design Scheme of Frequency-Conversion for Ap1000's Main Coolant Pumps, Electrical Equipment. China, vol. 8, p.20–24, April (1999).

Google Scholar

[5] Chenge Lin, Zhusheng Yu Advanced Passive safety Nuclear Power Plant AP1000, Nuclear Power Engineering. Chian, vol. 13, p.229–251, Jun. April (2003).

Google Scholar

[6] Rui Guan, Yongjun Gao, AP1000 reactor main pump shield manufacturing process, CHINA NUCLEAR POWER, China , vol. 1, p.49–54, April (2008).

Google Scholar

[7] Yiquan Xu, Jixiao Che, Yun Shu, Research and Mitigation Measures for Qinshan nuclear power plant small break loss of coolant accident, Nuclear Power Engineering. Chian, vol. 25, p.546–549, Dec (2004).

Google Scholar