The Application of Smart Vehicle Deployment System in Asphalt Concrete Factory

Article Preview

Abstract:

Asphalt concrete is one material of pavement engineering. Owning to the density of AC factories in Taiwan is highly concentrated and with the characteristic of industrial structure and operations, the margin is not much. Under this situation, only the entrepreneur with efficiently manage could run the business. Recently, the production of AC is tended to be institutionalized, computerized and automated. But the produce schedule and distribution still need to arrange by experienced staff. To AC factory and the manager of construction site, it is a very important issue that how to efficiently produce and distribution with more benefit. This research is based on the traditional model of experienced vehicle deployment which recording the delivered paths, time and related information. By the systemize analysis, we could compare the difference output of intelligent vehicle deployment system between the traditional one. This way, the actual benefit of deployment system could be estimated. This research result could be help for decision making.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 472-475)

Pages:

3407-3419

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Pang, W.H., A study on applying lean construction for rationalized maintenance in asphalt pavement, in Civil Engineering. 2010, Nation Central University: Taoyuan.

Google Scholar

[2] Feng, C.W. and H.T. Wu, Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks. Automation in Construction, 2006. 15(2): pp.186-199.

DOI: 10.1016/j.autcon.2005.04.001

Google Scholar

[3] Construction Engineering & Management, P.U. Simulation in Construction using CYCLONE & MicroCYCLONE. 2011; Available from: https://engineering.purdue.edu/CEM/People/Personal/Halpin/Sim/index_html.

Google Scholar

[4] Halpin, D., H. Jen, and J. Kim. A construction process simulation web service. 2003: IEEE.

Google Scholar

[5] Tsai, M., Utilization of Information Technology into Asphalt Plant Operation System, in Civil Engineering. 2008, National Central University: Taoyuan.

Google Scholar

[6] Feng, C.W., T.M. Cheng, and H.T. Wu, Optimizing the schedule of dispatching RMC trucks through genetic algorithms. Automation in Construction, 2004. 13(3): pp.327-340.

DOI: 10.1016/j.autcon.2003.10.001

Google Scholar

[7] Lai, W.-S., Integrated Models for Ready Mixed Concrete Production and Truck Dispatching, in Civil Engineering. 2007, National Central University: Taoyuan

Google Scholar