Parametric Design of Parts in an Integrated Simulation System Based on Asynchronous Mode of Pro/TOOLKIT

Article Preview

Abstract:

Based on software Pro/ENGINEER and Visual C++ 2005,sub-module of parametric design of assembly with wide universality was done by using Pro/TOOLKIT, and the design procedure was introduced in details. Assembly relation of sub-components is transformed into binary tree structure to store and search parts, and the assembly relation is displayed by CTreeCtrl control. The corresponding parts can be quickly found in the binary tree. Engineering drawing was automatically generated and displayed by ProductView after loading a part, and in this way dimensions of different parts can be modified according to engineering drawing in asynchronous mode. The sub-module can meet the needs of parametric design of parts in the integrated simulation system.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 479-481)

Pages:

1403-1408

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yunhua HE. CAD System for Intelligent Optimization and Modeling of Gear Based on Pro/E Customization, Coal Mine Machinery, Apr. 2010, 211-213. (In Chinese)

Google Scholar

[2] Wei LUO, Huayong XI. Parametric Design of Casing Based on Secondary Development of Pro/Toolkit [J], China Rural Water and Hydropower, 2009, Phase II, 88-90. (In Chinese)

Google Scholar

[3] Yingxian Qu, Kai Liu. Research on intelligent size marking of crank-shaft working based on Pro/TOOLKIT application program[J],Heavy Machinery,2005,No. 3, 30-34. (In Chinese)

Google Scholar

[4] Haibin WANG, Xuechun YANG, Yiqiong DONG. The Design of Involute Gear System Based on the Asynchronous Mode of Pro/TOOLKIT [J], Process and Equipment, 2008, 11, 68-75. (In Chinese)

Google Scholar

[5] Junfeng Cheng, Jinghu Shen. A parameterized design of component based on Pro/E secondary development, Modern Manufacturing Engineering [J], 2008, Phase II, 76-79. (In Chinese)

Google Scholar

[6] Parametric Technology Corporation. Pro/TOOLKIT Wildfire 4.0 APIWizard [M]. USA: Parametric Technology Corporation, 2007.

Google Scholar

[7] Yuping Qin, JingShang Ma. Data Structure(C Language Version)[M]. Beijing: Tsinghua University Press, 2005.(In Chinese)

Google Scholar

[8] Xiaolin Hou, Xiuyong Li, Aihua Liu. The Combination of Database & Pro/Engineer Secondary Development Applying in Product Design[J].Computer Engineering and Applications, 2005, 11, 189-192. (In Chinese)

Google Scholar

[9] Xiaoyun Yang. The establishment of the model library of the technology drawing and the application and study of the second exploration [D], Master's Thesis of Zhejiang University of Technology, 2007, 11.27-41. (in Chinese)

Google Scholar

[10] Shiguo Li. Pro/TOOLKIT Programming [M]. Beijing:Mechanical Industry Press, 2003, 7, 343-380. (In Chinese)

Google Scholar