Comparison of Construction Projects with Different Unit Wind Turbine Capacity

Article Preview

Abstract:

Development and utilization of renewable energy is important in optimize the power structure, save energy, protect environment, the development of low carbon economy has a positive role. Under the circumstances with wind machine price differ not big. The construction investment had little difference, under different capacity wind farm of the same capacity with different units. But when there is a bigger difference in wind machine price , it can be determination the rationality of the wind farm’s investment by the difference of the machine’ price preliminary. Also, it's available to estimate the whole investment. The wind farm 's permanent land area, according to the scale of wind farm, by estimating wind machines’, and the booster station, permanent land of transmission line and approach road area, then to determine the rationality of land area., on the basis of determining the wind farm project.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 512-515)

Pages:

690-693

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wind farm construction land use and environmental management Interim Measures The national development and Reform Commission,National Land Resources Ministry [2005]15.11 In Chinese

Google Scholar