Large WTGS and the Operation Conditions Simulated

Article Preview

Abstract:

Due to the large WTGS experiment difficulties, running environment complex and changeable, running condition is not prediction and not reproducibility and other characteristics, so the wind power control system development and testing of extremely limited. This paper introduce a large-scale WTGS main control test system, of which the WTGS model is built to simulate operation conditions of wind farm. By this way, reproducing the operation conditions is available, testing and debugging WTGS can go well without the influence of the randomness and intermittence of wind.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 512-515)

Pages:

723-727

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GB/T 19960.1-2005 wind turbine generator system part 1 general technical specification.

Google Scholar

[2] Mo Pin-Hao. VSCF wind power generators control technology research [D]. Huazhong university of science and technology, 2010.

Google Scholar

[3] Yang zhijun, Wu hongbin, Ding ming,etc. Control strategy of doubly-fed wind generation system for power grid fault[J]. Power System Protection and Control, 2010, 38(1): 14-18.

Google Scholar

[4] Li jun. Large wind generator and key components of the simulation analysis and optimal design research [D]. Chongqing university, 2011.

Google Scholar

[5] IEC61400-1-2005 Safety requirements for wind turbine generator system.

Google Scholar