Dynamic Correction Plan Model of Comprehensive Assessment Indexes for Electric Power Enterprises

Article Preview

Abstract:

With the gradual deepening of electricity market reform, electric power industry has not completely in accordance with the annual consolidated planning to organize the operation and development, but more and more by the macro-economic environment, the coal market fluctuations and other factors. This requires that power enterprise groups in the process of planning and controlling market boundaries to assess the scheme under various boundary conditions of the market. Presented a comprehensive plan of electric power Enterprise assessment method, according to the changing market environment, an amendment to the selected indicators, adjust the index value, so as to better meet corporate management target.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 516-517)

Pages:

1485-1489

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jian Huang , Yuan-biao Zhang , "Application of rough set theory in comprehensive evaluation of research ability," Science and Technology Management Research, vol.29, no.2, pp.83-84, 2009. (in Chinese)

Google Scholar

[2] Yang Cheng, Jie Zhang, Zhaorong Qu. Informatization performance evaluation system and method of enterprises[J]. computer engineering, 2007(2). (in Chinese)

Google Scholar

[3] Shang Tian, Chun Li. Construction of Performance evaluation indicator system in the process of enterprise informatization[J]. Statistics and Decision,2010(14). (in Chinese)

Google Scholar

[4] Shushan Zhang, Jia Mao, Daxin Gao, Feng Ju . Performance fuzzy comprehensive evaluation model and application of logistic enterprise informatization[J]. Jilin University Journal (liberal arts ed.),2009(3). (in Chinese)

Google Scholar

[5] Jun Yun, Yuan Li, "Effectiveness and optimization of index system chosen in project evaluation," Commercial Time, no.9, pp.47-48, 2009. (in Chinese)

Google Scholar

[6] MU Qi, "operation administration and maintenance of telecom power supply in electric power communication network," Inner Mongulia Petrochemical Industry, no.5, pp.71-73, 2008. (in Chinese)

Google Scholar

[7] B. Zhang and R. B. Zhang, "Research on fuzzy-grey comprehensive evaluation of software process modeling methods", Proc. Inter. Symp. on Knowledge Acquisition and Modeling, 2008, pp.754-758.

DOI: 10.1109/kam.2008.139

Google Scholar