A Heuristic Search Algorithm for a Dynamic Production Model with Random Factors

Article Preview

Abstract:

Economic lot and scheduling problem is one of the focuses in the international engineering field. Aiming at several kinds of products and sets of production lines, this paper introduces a production model, which is based on the principles of artificial intelligence and introduces random factors as time changes, such as market demand and production line equipment. Besides, this paper puts forward a dynamic heuristic search production schedule method, and the simulation results show that the effectiveness and predictability of this method.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 516-517)

Pages:

548-552

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Manne A S. Programming of economic lot sizes[J]. Management Science, 1958, 4(2): 115-35.

Google Scholar

[2] Rogers J. A computational approach to the lot scheduling Problem[J]. Management Science, 1958, 3(3): 264-91.

Google Scholar

[3] Moon, Giri B, Choi K. Economic lot scheduling problem with imperfect production processes and setup times[J]. Journal of Operational Research Society, 2002, 53: 620-629.

DOI: 10.1057/palgrave.jors.2601350

Google Scholar

[4] Zipkin P. Computing optimal lot sizes in the ELSP[J]. Operations Research, 1991, 39(l): 56-63.

DOI: 10.1287/opre.39.1.56

Google Scholar

[5] Raza S A, Akgunduz A, Chen M Y. A search algorithm for solving economic lot scheduling Problem[J]. Journal of Heuristics, 2006, 12: 413-426.

DOI: 10.1007/s10732-006-6017-7

Google Scholar

[6] Yu-Jen Chang, Ming-Jong Yao. Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach, 2010, 31(4): 809-835.

DOI: 10.1080/02522667.2010.10699997

Google Scholar

[7] Vinay A. Shirodkar, V. Madhusudanan Pillai. On the feasibility of sequence-dependent economic lot scheduling problem, International journal of production research, 2011, 49(10/11): 2925-2939.

DOI: 10.1080/00207541003738899

Google Scholar