Based on Industrial Engineering Production System Analysis and Improvement Research

Article Preview

Abstract:

The paper is focus on the assembly line of the factory .The nodular method and second-watch measuring methods are applied to measure the work time of the bottleneck stations. To improve the cycle time of the assembly line, the work contents of relative stations is reallocated. Finally, the production line is disposed again on the basis of the principle of ECRS and the line balancing theory .After implemented the new method, the capability of this production line has improved.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 542-543)

Pages:

320-323

Citation:

Online since:

June 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ling Zhao ,Jing Yang:Clothing workshop production line analysis and improvement research based on IE ,Advanced Materials Research :Materials Processing Technology PART4 Vol.291-294(2011), Pages 3147-3151

DOI: 10.4028/www.scientific.net/amr.291-294.3147

Google Scholar

[2] Junichi I shiwata, Yin Ichiro Kato. Zui xin xian chang IE guan li [M]. Haitian Press, 2004: 628—638. (In Chinese)

Google Scholar

[3] Lin Rongrui. Management techniques [M]. Xiamen University Press, 1999: 347—349. (In Chinese)

Google Scholar

[4] Bai Dongzhe. Sheng chan xi tong xian chang gong zuo yan jiu [M]. China Machine Press, 2004: 127—148. (In Chinese)

Google Scholar