Based on Industrial Engineering Production System Analysis and Improvement Research
Abstract:
The paper is focus on the assembly line of the factory .The nodular method and second-watch measuring methods are applied to measure the work time of the bottleneck stations. To improve the cycle time of the assembly line, the work contents of relative stations is reallocated. Finally, the production line is disposed again on the basis of the principle of ECRS and the line balancing theory .After implemented the new method, the capability of this production line has improved.