[1]
WANG Guan-yu. Research and Improvement of the Task Scheduling Algorithm in Grid Computing. Computer Engineering & Science, 2011, 10, 186-190.
Google Scholar
[2]
KONG Shao-ying, GUO Hong-liang. Application of Grid Task Scheduling Based on Hybrid Algorithm. Computer Simulation, 2011, 09, 140-142, 249.
Google Scholar
[3]
TIAN Yuan, YU Jiong, HOU Yong, WANG Ming-quan. Free resource selection approach based on fuzzy filter in grid. Journal of Computer Applications, 2010, 09, 2481-2484.
DOI: 10.3724/sp.j.1087.2010.02481
Google Scholar
[4]
HONG Liu, WAN Hu, GONG Jing-wen, CHEN Xue-guang. Resource scheduling for distributed simulation application in grid environment. Application Research of Computers, 2009, 03, 890-892, 896.
Google Scholar
[5]
Hamscher, V., Schwiegelshohn, U., Streit, A. and Yahyapour, R. Evaluation of Job-Scheduling Strategies for Grid Computing. GRID 2000, 191~202, 17~20 December 2000, Bangalore, India. Lecture Notes in Computer Science, Springer-Verlag.
DOI: 10.1007/3-540-44444-0_18
Google Scholar
[6]
TANG Jun. Globus-based Grid Platform Electronic Engineering Budget Job Scheduling Software Implementation. Science Technology and Engineering, 2009, 14, 4193-4196+4214.
Google Scholar
[7]
YI Kan, WANG Ru-chuan. Decentralized integration of task scheduling with replica placement strategy. Journal on Communications, 2010, 09, 94-101.
Google Scholar
[8]
CHEN you-wen, WEN xiong-jun. A Double-Deck Grid Task Scheduling Based on Improved Genetic Algorithm. Computer Systems & Applications, 2009, 09, 152-155.
Google Scholar
[9]
HUANG Xin, LIU Mei-mei, ZHU Qiao-ming, LI Pei-feng. Survey for grid monitoring architecture. Application Research of Computers, 2009, 26(1): 1-3.
Google Scholar
[10]
WOEHRER A, BREZANY P. A monitoring service for relational database to support advanced data integration on the grid[C]/proc of the 1st International conference on complex, Intelligent and software Intensive systems, Vienna IEEE computer Society, 2007: 27-34.
DOI: 10.1109/cisis.2007.6
Google Scholar
[11]
MA Man-fu, DUAN Fu-hai, HUANG Zhi-yi, ZHANG Wei-guo. Grid resource selecting based on cloud theory. Journal of Computer Applications, 2009, 04, 1162-1164.
DOI: 10.3724/sp.j.1087.2009.01162
Google Scholar
[12]
HUANG wen-ming, CHUI ya-nan, ZHU ying. A Resource Discovery Method of Grid Based on Agent. Computer Systems & Applications, 2009, 05, 76-80.
Google Scholar
[13]
LI Fang-yun, LI Chun-lin, LI Hui. Hierarchical and group-based resource selection algorithm. Application Research of Computers, 2009, 12, 4439-4441.
Google Scholar
[14]
Srinivasan,S., Kettimuthu,R., Subramani,V. and Sadayappan,P. Characterization of Backfilling Strategies for Parallel Job Scheduling. ICPP Workshops 2002, 514-522, August 2002, Vancouver, BC, Canada. CS Press.
DOI: 10.1109/icppw.2002.1039773
Google Scholar
[15]
[USA]Maozhen Li, Mark Baker written, WANG Xianglin etc. translation. The Grid Core Technologies [M]. Beijing: Tsinghua University Press, 2006. 12.
Google Scholar
[16]
DUAN Fu-hai, MA Man-fu. Maximum matching algorithm with QoS in grid resource scheduling. Journal of Computer Applications, 2010, 01, 108-110.
DOI: 10.3724/sp.j.1087.2010.00108
Google Scholar