PLC-Based Automatic Plating Line Design

Article Preview

Abstract:

In the vehicle engine's part, piston ring is a important part, which working environment is hard. It’s surface need to be enhanced so that to gain highly wear resistance and anti-corrosion properties. But in the piston ring manufacturing process, how to improve the working environment is a real urgent problem. This article present a design for SCADA(Supervisory Control and Data Acquisition) system using for automatic electroplating line, which use industrial PC , PLC and other components, connected by industrial network. Some detail technology are introduced.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 562-564)

Pages:

725-728

Citation:

Online since:

August 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chun Jie Yang, Hong Bo Kang, A Design of the Processing Equipment Monitoring System Based on Infrared and Wireless Technology, Advanced Materials and Computer Science, Key Engineering Materials (Volumes 474 - 476), April, 2011, pp.1141-1145.

DOI: 10.4028/www.scientific.net/kem.474-476.1141

Google Scholar

[2] Gongbo Zhou;   Zhencai Zhu;   Guangzhu Chen;   Aijun Zhang; Technique of WinCC Long-Distance Accessing Exterior SQL Server Database, Education Technology and Computer Science, 2009. ETCS '09, pp.153-155.

DOI: 10.1109/etcs.2009.295

Google Scholar

[3] CUI Yong-liang, LIU Yu, Application of WinCC V6. 0 Script in Electric Wire and Cable HMI System, Coal Mine Machinery, 2009. 4.

Google Scholar