The Research of Remaining Oil Distribution in High Water Cut Oilfield

Article Preview

Abstract:

The western South-eight block which is located in the comprehensive tap demonstration area of NO.2 oil production plant, has already gone through three years’ fine development. The production has been stable, the rising amplitude of comprehensive water cut has been small, and the natural decline rate has been controlled effectively. But with the deep development, this block has gone into the late ultra-high water cut stage. To maintain high efficient water flooding development is more and more difficult, therefore fine 3D geological modeling and reservoir numerical simulation work have been carried out. And some practical residual oil saturation diagrams have been put forward finally towards this block, which has provided a reliable basis for the next oilfield development.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 591-593)

Pages:

2555-2558

Citation:

Online since:

November 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] H.Y. Chen: Acta Petrolei Sinica, Vol. 24 (2003) No.3, p.74.

Google Scholar

[2] D.K. Han: Acta Petrolei Sinica, Vol. 28 (2007) No.2, p.73.

Google Scholar

[3] J.H. Wang: Acta Petrolei Sinica, Vol. 30 (2009) No.1, p.80.

Google Scholar

[4] A.P. Zheng, Z.Fu, Q.J.Lv and J.Li: Petroleum Geology and Engineering, Vol. 22 (2008) No.6, p.33.

Google Scholar

[5] J.J. Guo, S.S. Zhang, A.X.Yi, W.Li: Journal of Oil and Gas Technology, Vol. 34 (2012) No.3, p.140.

Google Scholar