Research on the Optimization of Dam Foundation Seepage Control System

Article Preview

Abstract:

The starting time of Dragonite hydropower station in Dadu River Sichuan delayed, which led to the depth of the cofferdam cut-off wall reduced in actual construction. In order to adapt to this situation, it’s necessary to optimize the processing scheme of sand layer dam foundation which is put forward in the feasibility study stage. Combined with the characteristics of engineering, considering to reduce or cancel the curtain grouting in coarse grain granite foundation of riverbed on the right bank in the feasibility stage design, this paper is aimed to study on the optimization design of Dragonite hydropower station dam foundation. The paper has not only a great guiding significance in engineering construction process, but also gives references to the similar earth-rock dam project for treatment of sand layer dam foundation and the arrangement of dam foundation seepage control system.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1143-1148

Citation:

Online since:

November 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chinese hydropower consultants group, Chengdu investigation & design institute: The optimization adjustment report of dam Foundation and structure of Dragonite hydropower station in dadu River Sichuan province, 2007.

Google Scholar

[2] Qu Zhijiong, Wang Tieru, Yu Zhongquan: Foundation Engineering (China Water Power Press, Beijing 1999)

Google Scholar

[3] Yang Jinliang: Soil Mechanics (Version 3) (China Water Power Press, Beijing 2006).

Google Scholar

[4] Yuan Guangyu: Hydraulic Engineering Construction (Version4). (China Water Power Press, Beijing 2005)

Google Scholar