Impact Assessment on the Ore Body under the Tower Footing of 500kV Transmission Line

Article Preview

Abstract:

Zhangjiaba-Enshi 500kV Transmission Line is a backbone network in the West to East Power Transmission Project of China, which passes through the factory area of Chongqing Sanxing Iron Mine Factory. According to solving the additional stress on foundation rock produced by tower load based on the Boussinesq theory and the redistribution of surrounding rock stress resulting from iron mining computed by using the calculation formula for redistribution stress on circular chamber in rock mass, this paper analyzes and demonstrates the impact of Zhangjiaba-Enshi Line N327 tower footing pressure mine on mining within the range of mining scheme, and determines that there is no mutual impact between the Zhangjiaba-Enshi Line N327 tower and exploitation of Sanxing ore horizon.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

115-120

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Beijing Jingwei Assets Appraisal Co., Ltd: The Mining Right Appraisal Report of Sanxing Iron Mine Factory in Qianjiang, No.38 Jingwei Assets Appraisal, Beijing (2002), p.3~7

Google Scholar

[2] Wang Liming and Guo Aiguo: Impact Assessment Report on Mining under N327 Tower Footing of Zhangjiaba-Enshi 500kV Transmission Line and N1694 Tower Footing of Xiangjiaba-Shanghai ±800kV Transmission Line, 2009-B072, Oct 2009.

DOI: 10.4028/www.scientific.net/amr.594-597.115

Google Scholar

[3] Chen Zhi and Su Aiqiang: Tower Design Report of Zhangjiaba-Enshi 500kV Transmission Line, volume 3 (2006).

Google Scholar

[4] Chongqing Institute of Geology and Mineral Resources: Constructed over Mineral Resource Reserve Appraisal Report, Jan 2010.

Google Scholar