Stress Analysis of High Thin-Walled Box Girder Bridge in Chong He Bridge

Article Preview

Abstract:

Based on the Chong He Bridge as research object, this paper expounds the purposes, methods and analysis results of prestressed concrete continuous thin-walled box girder bridge in the process of cantilever construction. The purpose of the research is to make a reasonable structure which meets the designed stress monitoring and to ensure the quality of construction. The method is to layout stress control points in the main control section and conduct real-time control. The result shows that the beam stress is within the safety range and can predict that the structure meets strength requirements in next stage. The conclusion is that through the data analysis, the results guide the whole process of bridge construction as well as fit the design plan.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1494-1497

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Jinglin Fen, Zhong Wang, Xiangxi Li: Stress monitoring and controlling research and analysis of the large span prestressed concrete continuous rigid frame bridge in Chinese. Vol. 32 No.6(2007), p.146

Google Scholar

[2] Weirong Lu: Large span prestressed concrete continuous beam bridge stress monitoring in Chinese. No 4(2011), p.151

Google Scholar

[3] JTG/T J21-2011.Specification for Inspection and Evaluation of Load-bearing Capacity of Highway Bridge in Chinese (2011)

Google Scholar

[4] Liqiang Wang, Meng Gao: Research on temperature stress in construction control of long-span bridge in Chinese. No 1(2010), p.24

Google Scholar

[5] Jianmin Wang: Road and Bridge Construction control of temperature stress in Chinese. No 2(2010), p.98

Google Scholar