p.2464
p.2470
p.2475
p.2481
p.2486
p.2490
p.2495
p.2500
p.2506
The Coupling Model of Wellbore Conduit Flow, Throttled Flow and Formation Seepage in Water Injection Wells
Abstract:
Separate layer water flooding is adopted in most oilfields in China and the injection flow rate is controlled by the diameter of water nozzle of each layer. In order to ensure the effect of water injection, applicable water nozzles need to be adjusted to meet the requirements of injection flow rate. The adjustment is commonly realized according to experience, which leads to long adjustment time and low efficiency. To solve this problem, the coupling model of wellbore conduit flow, throttled flow and formation seepage was established based on theoretical analysis, which could provide theoretical basis for water nozzles adjustment. In the model, the Bernoulli Equation was adopted to analyze wellbore conduit flow; indoor experiments were done to research throttled flow; the research object of the seepage was finite radius well in homogeneous infinite formation.
Info:
Periodical:
Pages:
2486-2489
Citation:
Online since:
November 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: