p.501
p.505
p.510
p.516
p.521
p.525
p.529
p.533
p.537
The Problems and Suggestions of the Desulfurization Wastewater Treatment System during the Operation
Abstract:
Wastewater treatment system was an important part of the wet desulfurization, and it played an important role to improve the quality of absorber slurry. Combined with the problems of desulfurization efficient reduced and moisture content in gypsum exceed normal, this paper pointed out the deficiencies which used the chlorine ion concentration to control the operation of desulfurization waster water; and suggested the influence of chlorine ion and the other impurities should be studied comprehensively, some guides for in-service supervision on the operation of FGD should be established as soon as possible.
Info:
Periodical:
Pages:
521-524
Citation:
Online since:
November 2012
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: