p.460
p.464
p.468
p.472
p.478
p.482
p.488
p.495
p.499
Optimization of CC Tail Bloom Operation
Abstract:
Cut-to-length bloom can not be controlled at the end of continuous casting process, and the yield of bloom is low. In order to improve the yield of bloom, the CC tail bloom system is proposed according to the bloom continuous casting conditions of equipment and process. Importantly, it is applied in the optimization of tail bloom operation in continuous casting process. Industrial tests show that the yield of bloom is improved obviously, with the quality of bloom is controlled as before.
Info:
Periodical:
Pages:
478-481
Citation:
Online since:
December 2012
Authors:
Keywords:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: