Optimized Operation of 2×660 MW Piping-Main Scheme Circulating Water System

Article Preview

Abstract:

The existing optimized operation of circulating water system does not suit piping-main scheme circulating water system with double-pressure condenser. The optimum vacuum of piping-main scheme should be defined as the vacuum which makes the difference between the sum of the two units’ added electric power and the circulating water pump power maximum. The plan of optimized operation of piping-main scheme circulating water system which is based on this kind of optimum vacuum was put forward. And a specific example of 2×660MW units was given, the power plant’s optimized operation mode of the whole circulating water system at difference conditions was obtained. The results show that the optimized scheme is correct and suit the piping-main scheme circulating water system, and the optimized operation can well improve the steam turbine economy.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 608-609)

Pages:

1262-1265

Citation:

Online since:

December 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yong Li, Fangqun Meng, Lihua Cao, Hongqi Shi, Guojun Li: Turbine Technology. Vol. 47, No. 2 (2005), p.84. (In Chinese)

Google Scholar

[2] Xiaoxia Ge, Guojun Miao, Peng Zhong, Zhigao Xu: Journal of Power Engineering. Vol. 30, No.14 (2009), p.389. (In Chinese)

Google Scholar

[3] Fudong Qi, Shuben Jia, Yiwei Ma. Power Plant Condensing Equipment and Cooling System. Beijing: Water Resources and Electric Power Press, 1990. (In Chinese)

Google Scholar

[4] Lihua Cao, Jianguo Jin, Yong Li: Turbine Technology, Vol. 48, No. 1 (2006), p.11. (In Chinese)

Google Scholar