p.630
p.634
p.642
p.650
p.655
p.661
p.665
p.669
p.673
Study on Comprehensive Gas Control Technology of High-Gas Fully Mechanized Caving Face
Abstract:
In order to comprehensively control the gas of 1151(3) fully mechanized caving face in Xieqiao coalmine scientificly and efficiently, combining the actual situation of the face, gas drainage technologies such as roof drilling, drilling along seam, gas drainage in upper corner, roof drainage roadway had been applied and a comprehensive gas control system was formed gradually. Gas problems of the face have been solved completely and safety and high efficiency of the workface has been ensured.
Info:
Periodical:
Pages:
655-660
Citation:
Online since:
December 2012
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: