[1]
Hong-ga Zhao, Yu-sheng Xue, De-xing Wang etc, Automation of Electric Power System, 2004(17), In Chinese
Google Scholar
[2]
BingWang, Shi Jing, Electronic Test, 2011(1), In Chinese
Google Scholar
[3]
Tao Zheng, Fu-ying Gao, Automation of Electric Power System, 2009(11), In Chinese
Google Scholar
[4]
BoWang, Jinjun Lu, Power System Protection and Control, 2012(1) In Chinese
Google Scholar
[5]
Jin-ju Lu, Ze-mei Dai, LiZhang etc, Automation of Electric Power System, 2012(8), In Chinese
Google Scholar
[6]
Dy Liacco, T.E.The adaptive reliability control system[J].IEEE Trans.on PAS, 1967, 86(3):PAS一86.
DOI: 10.1109/tpas.1967.291728
Google Scholar
[7]
Ming Ding, Sheng-hu Li, Hong-bin Wu etc, Proceedings of the CSEE, 2004(4), In Chinese
Google Scholar
[8]
Xian-zhong Duan,Yang-zan He, De-shu Chen, 1994(9), In Chinese
Google Scholar
[9]
Wei Li, East China Electric Power, May 2010, In Chinese
Google Scholar
[10]
Yong Hou, Wei-hua Zheng, East China Electric Power, May 2010, In Chinese
Google Scholar
[11]
Wei Luo, Ze-mei Dai, Power System Technology, 2011(6) In Chinese
Google Scholar
[12]
Wei Luo, Ze-mei Dai, Qian-tao Huo, Automation of Electric Power System, Dec 2007, In Chinese
Google Scholar
[13]
Jun-yong Liu, Xiao-dong Shen, Li-feng Tian etc, Electric Power Automation Equipment 2010(1) , In Chinese
Google Scholar
[14]
SongHan, Li-quan He, Guo-yue Qiu, Eiectrical Measurement& Instrumentation, 2011(4) In Chinese
Google Scholar
[15]
Xi Jin, Wen-hui Wu, Shi-min Wu etc, Power System and Clean Energy, 2010(10) In Chinese
Google Scholar