The Optimization Research of Wide Strip and Full-Pillar Mining under Villages

Article Preview

Abstract:

By making full use of the advantages of strip mining method and full-pillar mining method, the wide strip and full-pillar mining method can achieve the aim of mining under villages. However, at the full-pillar mining stage, the difficulty in managing several workfaces which are at work at the same time still exists. To improve the wide strip and full-pillar mining method’s applicability, an optimization of extraction sequence for coal pillars instead of the multi-working-face is put forward at the stage of full-pillar mining, and in the case of the deformation limit of surface structures is satisfied, to extract all the coal pillars which are under villages. By specific analysis of the extraction sequence optimization of the coal pillars in No.1 mine under Qian Xudapo village which belongs to Chang Chun coal Co., LTD., a better result is got which also acts a technological reference for the extraction under villages.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 616-618)

Pages:

406-410

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] G. Liu H.X. Zhang and N.Z. Xu: Journal of China coal society,Vol.33(2008),p.1086 (in Chinese)

Google Scholar

[2] H.X. Zhang and Y.X. Zhao:Coal Mining Technology,Vol.5(2000),p.5(in Chinese)

Google Scholar

[3] W.B Guo K.Z. Deng and Y.F. Zou:Coal science and technology,Vol.32(2004),p.7(in Chinese)

Google Scholar

[4] H.X. Zhang and J.X. Wang:Mine surveying,(2000),22~24 (in Chinese)

Google Scholar

[5] H.X. Zhang X.G. Li and D.M. Liu:Coal Mining Technology,Vol.7(2002),p.16(in Chinese)

Google Scholar

[6] J.X. Li,L.G. Wang and M.S. Feng:Journal of Liao Ning Technical University,,Vol.24(2005), p.42 (in Chinese)

Google Scholar