Research on Preparation Technology of Exposed-Aggregate Cement Concrete Pavement

Article Preview

Abstract:

Through a large number of laboratory tests,authors study the preparation technology of exposed-aggregate cement concrete pavement, such as the spraying time, spraying dose of exposed-aggregate agent and the flush time. According to the tests results, the spraying time of exposed-aggregate cement concrete declines constantly with the increase of temperature and the appropriate spraying dose of exposed-aggregate agent is determined. The higher the temperature the earlier the flush time. There is a bigger time interval, more than 10h for normal temperature between the earliest and latest flush time.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 652-654)

Pages:

1233-1236

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Sen Han: The research of exposed-aggregate cement concrete pavement[D]. Ph.D. Thesis of Chang'an University, 2006. In Chinese.

Google Scholar

[2] Yongchao Song, Xiaodong Pan, and Naixing Liang: Journal of East China Jiaotong University, 2008, (2): 12-15. In Chinese.

Google Scholar

[3] Ming Qin, Naixing Liang: Road Machinery & Construction Mechanization, 2009(8): 43-46. In Chinese.

Google Scholar

[4] Sen Han, Zhiling Li, and Dongxing Zhang: China Journal of Highway and Transport, 2004, (4): 17-20. In Chinese.

Google Scholar

[5] Kuemmel: Noise characteristics of pavement surface texture in Wisconsion. TRR1544, 1997: 24-25.

Google Scholar

[6] Xiangqian Cao, Sen Han: Highway traffic technology: Application Technology Edition, 2009, (11): 41-43. In Chinese.

Google Scholar