Analysis of Displacement Monitoring Measurement in Tunnel Construction

Article Preview

Abstract:

Based on measured data of Wuxinzhai tunnel in expressway of Shanyin to Pinglu, mathematical methods were used to make regressing analysis of measured date on crown settlement and periphery convergence. According to the time-effect of soil mass excavation in New Austrian Tunneling Method, the relations between rock deformation and time during the tunnel construction was analyzed. The results of analysis could provide an theoretical basis for modifying design and construction , and also could offer an example for similar projects in this area.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

635-638

Citation:

Online since:

January 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Pingding Qiao, Zengjun Li: Traffic Tunnel Engieering, Changsha, Zhongnan University Press (2003).

Google Scholar

[2] Xiaoqing Li: Tunnel engineering, Beijing, China Building Industry Press (2004).

Google Scholar

[3] Xiaohong Li: NATM Tunneling measurement technology, Beijing, Science Press (2002).

Google Scholar

[4] Guobo Wang, Meifang Wang, Li Yao, Changmin Guo: Journal of Liaoning Provincial College of Communications Vol. 11 (2009), p.20.

Google Scholar

[5] China First Highway Engineering Co., Ltd.: Technical Guidelines for Constructuin of Highway Tunnel, Beijing, China Communications Press (2009).

Google Scholar