p.1282
p.1287
p.1291
p.1297
p.1301
p.1306
p.1315
p.1319
p.1324
Study on Reasonable Length of Ballasted-CRTS II Ballastless Track Transition Section on High-Speed Railway Bridge
Abstract:
In view of ballasted-CRTSⅡ ballastless track transition section on the bridge of Beijing-Shanghai high-speed railway, the influence of track random irregularity and pier foundation settlement difference on acceleration and stability index of locomotive body are discussed by the finite element method. And then, by using the index of rail deflection gradient to describe the law of dynamic interaction, rail-wheel dynamic response, attenuation distance of locomotive body acceleration and change of sleeper pressure caused by under-rail stiffness difference are analyzed. Finally, the recommended value of reasonable length of transition section is put forwarded.
Info:
Periodical:
Pages:
1301-1305
Citation:
Online since:
March 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: