Construction Technology and Organization of Jiande Yangxi Main Bridge

Article Preview

Abstract:

The Yangxi main bridge for 49+120+49 m the self-anchored suspension bridge, the main girder procedure full framing in situ girder construction, bridge tower using piecewise casting method construction, use scaffolding as construction operation platform. Main cable construction using prefabricated parallel wire strand method (PPWS), first within the plant into steel wire strand, roll in the drum on delivery to the bridge site erection points, with traction rope by stock installation in place. Saddle the fission lifting, cable clamp installed application to the calibration of jack import screw tension 420 kn, and three times repeated tension, sling the factory-made after installation in place. Can be used as the same bridge comparison and reference.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 671-674)

Pages:

1988-1992

Citation:

Online since:

March 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] LeiJunQing, ZhengMingZhu, XuGongYi. Suspension bridge design [M]. Beijing: people's traffic press, 2002, 12-53.

Google Scholar

[2] WenShuDong, ZhengKaiFeng, LiHuai wide. Space line the self-anchored suspension bridge linear accurate calculation method study (J). The highway engineering, 2007, (4) : 127-135.

Google Scholar

[3] FengGang, DengWu. Xiangjiang river sancha rocky bridge main hole from anchor cable system installation and system conversion [J]. journal of highway engineering, 2008, 55 (4) : 110-113.

Google Scholar

[4] QianDongSheng, ChenRenFu long-span suspension Bridges. The design and construction [M]. Chengdu: southwest jiaotong university press, 1992. 54-64.

Google Scholar

[5] XuHuiChun. Guilin li ze the self-anchored suspension bridge construction technology [J]. Railway standard design, 2004, (4) : 29-31.

Google Scholar