Stress Monitor and Control in Cantilever Construction of a Continuous Bridge

Article Preview

Abstract:

Stress monitor and control in Cantilever Construction of a big span bridge is introduced. Influences of load state, temperature and humidity are eliminated through structure testing and parameter identification during construction. The errors between measured data and design values are analyzed to ensure construction to agree with the design.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 671-674)

Pages:

2063-2066

Citation:

Online since:

March 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] JTG D62-2004, Design Code of R. C. and P. C. Highway Bridges and Culverts[S].

Google Scholar

[2] K Worden, A P Burrows, Optimal sensor placement for fault detection[J], Engineering Structure, 2001, 23: 882-900.

Google Scholar

[3] Shi Z Y, Law S. S, Zhang L M, Optimizing sensor placement for structure damage detection[J], Journal of Engrg Mech, ASCE, 2000, 126(11): 1165-1180.

Google Scholar

[4] D. Inaudi, et al. Monitoring of a Concrete Arch Bridge during Construction. Smart Structures and Materials, San Diege, 2002: 1690-5011.

Google Scholar

[5] He Shuanhai. Structure theory and calculation method of road bridge[M]. Beijing: People Communication Press, 2003: 54-59.

Google Scholar

[6] Yao Lingsen, Bridge Engineering[M]. Beijing: People Transport Press, 2000: 76-80.

Google Scholar