Forward-Calculating Optimization Method for Determining the Rational Construction State of Cable-Stayed Bridges

Article Preview

Abstract:

In order to determine every rational construction state and obtain perfect finished dead state of the cable-stayed bridge, a quadratic programming model for optimizing cable tension was put forward. The adjustment of multi-object control parameters was achieved by using the weighting coefficient in the optimization model. In the optimization calculation of a cable-stayed bridge, the forward-calculating method was used and the results show that mechanics concept of this method is definite, the rate of convergence is fast and some disadvantages of other methods are avoided.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 671-674)

Pages:

980-984

Citation:

Online since:

March 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Rucheng Xiao, Haifan Xiang. Chinese Journal of Computational Mechanics. 1998, 15(1), p.118, in Chinese.

Google Scholar

[2] Donghuang Yan, Guang-dong Liu. China Journal of Highway and Transport. Vol. 12(2)(1999), p.59, in Chinese.

Google Scholar

[3] Zhiguang Liang, Jianzhong Li, Xianfeng Shi. Engineering mechanics. Vol. 17(3) (2000), p.121, in Chinese.

Google Scholar

[4] Peng Liang, Rucheng Xiao, Yue Xu. Journal of Chang an University(Natural Science Edition). Vol. 26(4) (2006) , p.49, in Chinese.

Google Scholar

[5] Jian-min Zhang,Rucheng Xiao. China Journal of Highway and Transport. Vol. 19(3)(2006) , p.34 , in Chinese.

Google Scholar