Research on Supply Chain Profit Coordination Mechanism Based on JIT Lot-Splitting

Article Preview

Abstract:

A supply chain profit coordination mechanism based on JIT lot-splitting, which involves a two stage supply chain consisted of a supplier and a buyer, is discussed. Based on the bargaining power of supplier, the profit coordination with and without incentives are respectively explored. For the total cost minimizations of buyer and supplier separately, two stage stackelberg leader-follower game models, in which buyer is the leader and supplier is the follower, are established. Supplier applies JIT delivery to reduce buyer’s cost and the total cost of the supply chain via dividing buyer’s order per batch into some batches to deliver. Finally, a numerical example and a simulation analysis are given and the impact of the variation of relative parameters on the total cost saving of buyer, supplier and system is discussed. In addition, the efficiency of game decision on the basis of JIT lot-splitting is proved.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 694-697)

Pages:

3466-3471

Citation:

Online since:

May 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yan D,Carter C R, Dresner M E. JIT Purchasing and Performance:an Exploratory Analysis of Buyer and Supplier Perspective [J]. Journal of Operations Management, 2001,19:471-483.

DOI: 10.1016/s0272-6963(00)00066-8

Google Scholar

[2] Dada M,Srikanth K N.1987.Pricing policies and quantity discounts.Management Science,1987,33(10):1247-1252.

DOI: 10.1287/mnsc.33.10.1247

Google Scholar

[3] Goya S K,Gupa Y.Integrated Inventory models:The buyer-vendor coordination. European Journal of Operational Research ,1989,41:261-269.

DOI: 10.1016/0377-2217(89)90247-6

Google Scholar

[4] Banerjee A. A Joint Economic Lot Size Model for Purchaser and Vendor [J]. Decision Sciences,1986,17 : 292-311.

DOI: 10.1111/j.1540-5915.1986.tb00228.x

Google Scholar

[5] Wang H Y,Ding H,Zhang C H, Wang B,Yang M. Lot Sizing Problem in a JIT System with Time-Varying Delivery[J].Chinese Journal of Management Science, 2012,20(5):83-89.

Google Scholar

[6] Ma ZJ,Dai Y,Liu F. A stochastic Programming Model for Integrated Logistics Network Design in Hybird Manufacturing /Remanufacturing system[J].Chinese Mechaniscs Engineergin, 2006,17(9):362-366.

Google Scholar

[7] Hill R M. The Single - vendor Single - buyer Integrated Production Inventory Model with a Generalized Policy[J ]. European Journal of Operational Research,1997, 97 : 493-499.

DOI: 10.1016/s0377-2217(96)00267-6

Google Scholar

[8] Kim S L,Ha D. A JIT Lot - splitting Model for Supply Chain Management : Enhancing Buyer – supplier Linkage [J].Int.J.Production Economics,2003,86:1-10.

DOI: 10.1016/s0925-5273(03)00006-9

Google Scholar

[9] Chang C T,Chiou C C,Liao Y S,Chang S C.Anexact policy for enhancing buyer-supplier linkage in supply chain system[J]. Int.J.Production Economics,2008,113:470-479.

DOI: 10.1016/j.ijpe.2007.10.005

Google Scholar