Analysis of Evaluating Bid Price of Reasonable Lowest Price in Construction Project Bidding

Article Preview

Abstract:

the biggest characteristics of Bidding are openness, fairness and preferred. The essence of the tender and bid is making advanced productive foreces develop much better and backward productivity eliminated through the market competition mechanism so as to effectively promote economic development and social progress. In this paper, we discussed and analysed the pricing method of reasonable lowest price evaluation of the bid assessment in construction project bidding, providing effective reference for reasonable lowest price evaluation method in construction project bidding.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

775-779

Citation:

Online since:

June 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Y.W,Zhang, Discussion about reasonable lowest price evaluation bid assessment scale,J. Building Economy. 7(2000) 13-18.

Google Scholar

[2] X.Z.Li, Discussion on bill of quantities bidding method of theoretical, J. Building Economy. 5(1999) 59-65.

Google Scholar

[3] J.J. Zhu, Y. Lin, R. Lu, Study on rational low quoted price and deeply,J. Jiangsu Architecture. 4(2005)88-94.

Google Scholar

[4] F.Huang, Study about rational low quoted price method,J.Science and Technology Business Issue.17(2004)40-46.

Google Scholar

[5] H.Li, Study on lowest bid method,D.Foreign Economic and Trade University. 2007.

Google Scholar