Key Problems on New Underpass Beneath the Existing Highway

Article Preview

Abstract:

This paper is a new crossing of a certain city through existing project based on the highway, the 3D numerical simulation is used to the new crossing the roads longitudinal effects of vertical scope, the settlement of surrounding rock and the road, the stress value, as well as the lining of the stress state of. Research shows that six excavation can effectively control the road and the new tunnel surrounding rock displacement and stress by using CRD method in construction; the existing road longitudinal impact area from both ends of road about 6m; lining structure in a safe state, but the wall removed, effect on the internal force of lining is larger, should give attention to construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

337-341

Citation:

Online since:

June 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GUAN Baoshu. Tunnel engineering construction points set [M]. Beijing: China Communications Press, 2003.

Google Scholar

[2] FANG Yong. Earth pressure balanced shield tunneling process to the formation of influence and control [M]. Doctoral Dissertation, Chengdu: Southwest Jiaotong University.

Google Scholar

[3] Zhang Chengping, et al. Analysis of ground subsidence induced by shallow-buried tunnel construction and its control techniques [J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2): 3601-3608.

Google Scholar