[1]
Lichu Fan: PC continuous box girder. (China Communications Press, Beijing 1988)
Google Scholar
[2]
Xudong Shao, Lifeng Li, Weigang Bao. Calculation and analysis of transverse temperature stress for concrete box girder. Journal of Chongqing Jiaotong University, 2000, 19(4):5-10(in Chinese).
Google Scholar
[3]
Jianshu Ye, Lin Jia, Peishu Qian. Observation and research on temperature distribution in concrete box girders. Journal of Southeast University, 2002, 32(5):788-793(in Chinese).
Google Scholar
[4]
Weijiang Kang. The Research on Sunshine Temperature Effect of Continuous Rigid Frame Bridge. Dissertation for the Master Degree. Changsha: Hunan University, 2000(in Chinese).
Google Scholar
[5]
Guangqiang Shao. Stress Analysis and Structure Optimization of the Closure for the Pc Continuous Box Girder Bridge. Dissertation for the Master Degree. Changsha: Hunan University, 2000(in Chinese).
Google Scholar
[6]
Bin Liu, Yuting Xu. New Balance Cantilever Cast Technics for the Closure. Journal of Building Safety, 1999, 14(4):38-40(in Chinese).
Google Scholar
[7]
Jirao Zhang, Changjiang Wang. PC Continuous Beam Bridge by Cantilever Casting. (China Communications Press,Beijing 2004)(in Chinese).
Google Scholar
[8]
Airong Chen, Haifan Xiang. A New Calculation Method of the Wind in High Cantilever Construction for Rigid Frame Bridge. Journal of Road, 1998(3)(in Chinese).
Google Scholar
[9]
Yupeng Cai. Wind Resistance Analysis for High Pier and Long Span Bridge. Journal of China Shipping, 2006,4(4):82-83(in Chinese).
Google Scholar
[10]
JTG/T D60-01-2004. Code for Design of Highway Bridges. Beijing: China Bridge Industry Press, 2004 (in Chinese).
Google Scholar
[11]
Sheng Wen, Xiangdong Yu. Study on wind loads response of the Yichang Yangtze River railway bridge during double cantilever erection stages. Journal of Enterprise technology development, 2006, 25(5): 27-29(in Chinese).
Google Scholar
[12]
Zhigang Liu, Airong Chen. Practical Method for Calculating Equivalent Wind Loads on Double Cantilever Bridges. Journal of Tongji University,2002,30(5):599-603(in Chinese).
Google Scholar
[13]
Gangliang Liu, Zhongwen Wang, Jianhui Huang and et.Safety investigation of wind for the 270m Continuous Rigid Frame Bridge-Humen Bridge During the Cantilever Casting. Bridge Construction,1995,2:57-60(in Chinese).
Google Scholar
[14]
Yuanfang Xie. Analysis of Safety of Long Span Continuous Beam Bridge During Cantilever Casting Stage. Dissertation for the Master Degree. Beijing: Beijing Jiaotong University,2011(in Chinese).
Google Scholar