Application and Numerical Simulation of Advanced Small Pipes Grouting in Tunnel Engineering

Article Preview

Abstract:

Advance support is an effective anchoring method in the tunnel construction especially for the tunnels getting through the weak and broken rock mass. However, the supporting effectiveness can hardly be predicted due to the design which is mainly relying on experiences. In this paper, the supporting mechanism and theory of advanced small pipes used in worse geological tunnel is analyzed and numerical simulation has been done using FLAC3D for Hongshigou tunnel. Finally, the effectiveness and rationality of advanced small pipes technique is evaluated.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

706-709

Citation:

Online since:

July 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Huang-Chengguang. Construction of Highway Tunnel [M]. Beijing: People 's Communications Press, (2001)

Google Scholar

[2] Zhao-Jianping. Shallow Tunnels pipe roof mechanism and its utility [D].Central South University, a master's degree thesis . 2005.1 ~ 2

Google Scholar

[3] Jin-Changyu, Feng-XiaTing. Research and application of nonlinear elastoplastic-harden contact constitutive model in disturbed belt. Materials Research Innovations.2011.15(supp.1): S605-S608

DOI: 10.1179/143307511x12858957677154

Google Scholar

[4] Jin-Changyu, Zhang-Chunsheng, Feng-XiaTing. Research on influence of disturbed belt on stability of surrounding rock of large-scale underground caverns [J]. Rock and Soil Mechanics, 2010,31(4): 1283-1288

Google Scholar

[5] Li-Shucai, Li-Shuchen, Zhu-Weishen, Application of the elastic-plastic large displacement finite element method to the study of deformation prediction of soft rock tunnel [J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(4):466-470.

Google Scholar