Analysis of Steam Reclaim in Cooling Tower
Abstract:
Thermal power generation in China as the main energy production, the production process consumes a lot of water resources. It is significant and the overall layout of the development of the national economy and the effective utilization of water resources, for the water consumption of the accurate calculation of thermal power generation process. The value through the site have been extracted, The water consumption of power plant cooling tower unit and the emissions per unit of energy was calculated and analyzed.