p.2685
p.2689
p.2694
p.2699
p.2704
p.2708
p.2712
p.2717
p.2721
The Programming Model about Petroleum Pipeline
Abstract:
Through two refineries to the railway line distance and the distance between the two refineries of different situations, the nonlinear programming model is set up. In the model through the economic and security programs for the laying of oil pipelines, pipeline price oil pipeline on the laying of the program, the city laying pipelines on the pipeline laying of additional costs related to the analysis of the problem, we solve the problem. We solve the problem of oil pipeline layout, and give the best solution to the laying of oil pipelines.
Info:
Periodical:
Pages:
2704-2707
Citation:
Online since:
August 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: