Study of Computer Aided Process Planning Base on B/S Structure

Article Preview

Abstract:

With the flourish development of internet technique, information and resources in sharing goes into more quickly and conveniently, which makes the traditional CAPP system convert into the system based internet technique and the advantages are more and more obvious. This paper introduces a kind of design way of CAPP based B/S system, which realizes multi-user parallel designing and technique information in sharing and managing remotely, which increases the benefits and competition ability and guarantees the output quality.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 734-737)

Pages:

2778-2781

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Dae.Hyuk Chung,Suk-Hwan Suh. Nonlinear Proeess Planning implementation for complex machining[J],2008,40(5):521-536.

Google Scholar

[2] H yun Chan Lee,Won Chul Jhee,Hee-SokPark. Generative CAPP through Projective Feature Recongnition[J] Computers&Industrial Engineering,2007,52(2):241-246.

DOI: 10.1016/j.cie.2007.06.015

Google Scholar

[3] B.Denkena,M.ShPitalni,P.Kowalski,GMoleho.kowledge Management in Proeess Planning[J],CIRP Alinals Manufaeturing Technology,2007,5(l):175-180.

Google Scholar

[4] C.Grabowik,R.kosala. The method of kowledgere presentation for a CAPPsystem[J],Joumal of Materials Proeessing Technology. 2003133(l):90-98.

Google Scholar

[5] Xionghui Zhou,Yan jie Qiu. A feasible approach to the integration of CAD and CAPP[J], Computer Aided Design,2007,39(4):324-338.

DOI: 10.1016/j.cad.2007.01.005

Google Scholar

[6] Manish Kumar,Sunil Rajotia. Integration of scheduling with computeraided Proeess Planning[J]. Journal of Materials Proeessing Technology,2003,138(l):297-300.

Google Scholar

[7] M.Kang,J.Han,J.GMoon. Anapproach for interlinking design and Proeess planning[J], Joumal of Materials Processing Technology,2003,139(l):589-595.

Google Scholar