Abstract:

System design generally involves making long-term decisions such as facility layout and system capacity/configuration. As such, models are typically created and used for a single design exercise, and model run time is not a significant factor during the simulation process. The simulation process is based on the use of Simio standard simulation program. This chapter comprises of a generic workstation diagram that shows a setup of an ideal assembly line. This assembly diagram is the basis from which a flowchart/ algorithm is derived from. The assembly line consists of workstations (one to some given number N). N in case is six. Each workstation is fed by buffer storage areas which are continuously replenished according to the supply conditions of the program. A transporter transports the assembly in between stations. This transporter can either be a conveyor as is with Arena, or a vehicle, as is the case in the Simio program. The Generic Flowchart is based on the Generic Assembly Diagram. The given steps from the identification of the component to has the component has been assembled occur in one assembler and are for one component. These activities (flowchart) are repeated for each component up to the required number of components that make-up the product, i.e. the loops are repeated for each component in the assembly process. The purpose of this paper is to establish a generic simulation process, which will be based on the generic algorithm and generic assumptions to be used to simulate an automated assembly process. In this generic program, the following parameters can be varied: number of workstations, number of components, and order of assembly, cycle time, time to assembly, component and workstation availability and buffer capacity.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

14-26

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] S. C. Mathewson, "The application of program generator software and its extensions to discrete events simulation modeling", (1984).

Google Scholar

[2] Haldum Ayutug and Can A. Dogan, "A framework and a simulation generator for KANBAN-controlled manufacturing systems", (1998).

Google Scholar

[3] O'Keefe and Haddock, "Data-driven generic simulators for flexible manufacturing systems", (1991).

Google Scholar

[4] O. F. Baykoc and S. Erol. "Simulation modeling and analysis of a JIT production system," (1998).

Google Scholar

[5] A. Agnetis and A. Pacifici, "Scheduling of flexible flow lines in an automobile assembly plant", (1997).

Google Scholar

[6] E. Kozan, "An integrated material handling system for a truck assembly plant", Journal of the Operational Research Society, (2000).

DOI: 10.2307/254084

Google Scholar

[7] E.J. Williams, O.M. Ulgen, C. DeWitt, "An approach and interface for building generic manufacturing kanban-systems models", in: Proceedings of the Winter Simulation Conference, 2002.

DOI: 10.1109/wsc.2002.1166370

Google Scholar

[8] O. Korkmaz, D.C. Wood, A. Gunal, "Managing Large Scale Material Flow Systems in Simulation", Production Modeling Corporation, 2003.

Google Scholar

[9] Q. Hao, W.M. Shen, "Implementing a hybrid simulation model for a Kanban-based material handling system", Robotics and Computer-Integrated Manufacturing, (2008)

DOI: 10.1016/j.rcim.2007.09.012

Google Scholar