Production Control Strategy and its Parameters Optimization for a Two-Stage Production System

Article Preview

Abstract:

On-off of the standby system is an important factor that influences the performance of the production system. A dual threshold control strategy based on the on-off control of the standby system is proposed for the optimal control of the two-stage production system for which the last stage has stochastic production capacity. A control parameters optimization model is built with the objective of minimizing the total production cost, and a genetic algorithm is adopted to resolve the optimization problem. Finally, an example is taken to validate the effectiveness of the proposed dual threshold control strategy and the parameter optimization algorithm.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1223-1228

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Gharbi, A., Kenné, J. -P., Hajji, A. Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups. International Journal of Production Research, 44(3), 2006, 545-567.

DOI: 10.1080/00207540500270364

Google Scholar

[1] YAN H S, MENG X G, SHI W W, et al. Production Control of Tree-structured Manufacturing System. JOURNAL OF MECHANICAL ENGINEERING, 45(8), 2009, 148-154.

Google Scholar

[2] Kagan Gokbayrak, Omer Selvi. Optimal hybrid control of a two-stage manufacturing system. Proceedings of the American Control Conference, 2006, 3364-3369.

DOI: 10.1109/acc.2006.1657238

Google Scholar

[3] Cassandras, Christos G., LIU, Q J, Gokbayrak, Kagan et al. Optimal control of a two-stage hybrid manufacturing system model. Proceedings of the IEEE Conference on Decision and Control, 1, 1999, 450-455.

DOI: 10.1109/cdc.1999.832819

Google Scholar

[4] Mao J F, Cassandras, ChristosG. Optimal control of two-stage discrete event systems with real-time constraints, Discrete Event Dynamic Systems: Theory and Applications, 17(4), 2007, 505-529.

DOI: 10.1007/s10626-007-0019-y

Google Scholar

[5] Aghezzaf E, Sitompul C, Van den Broecke F. A robust hierarchical production planning for a capacitated two-stage production system, COMPUTERS & INDUSTRIAL ENGINEERING, 60(2), 2011, 361-372.

DOI: 10.1016/j.cie.2010.12.005

Google Scholar

[6] LIU L M, LI H. Production control in a two-stage system . European Journal of Operational Research, 174(2), 2006, 887-904.

DOI: 10.1016/j.ejor.2005.03.036

Google Scholar

[7] FENG D Z, Yamashiro, M. Operation planning for a two-stage production system under lumpy demand. Intelligent Robots and Systems, 2, 2004, 1257-1262.

DOI: 10.1109/iros.2004.1389568

Google Scholar

[8] SUN Yu, TAN Min. Reliability Analysis of a Transfer Line with Machines of Variable Processing Rates. CONTROL, 17(2), 2000, 255-258.

Google Scholar

[9] GURSOY, M.B., DANHONG, H., ALTIOK, T. OPTIMAL POLICIES FOR TWO-STAGE, PULL-TYPE PRODUCTION/INVENTORY SYSTEMS. Proceedings of the 31st IEEE Conference on Decision and Control, 2, 1992, 1682-1683.

DOI: 10.1109/cdc.1992.371142

Google Scholar

[10] LEI Yingjie, ZHANG Shanwen, LI Xuwu, et al. MATLAB Genetic Algorithm Toolbox and Application (XIAN: XIDIAN UNIVERSITY Press, 2005).

Google Scholar