Controllable Blasting Technology of Urban Road-Cut Excavation Project under 220kV Super-Voltage Transmission Line

Article Preview

Abstract:

There are 220kV super-voltage transmission lines and electrification line above the road-cut excavation blasting project, which is near the buildings, the blasting vibration and fly-rocks shall be strictly controlled, thus the blasting design and construction are difficult. This paper describes the controllable blasting technology design of the road-cut excavation in the complex environment, the blasting parameter selection, the detonating network and the safety technology. Practice has proved that the blasting vibration and individual fly-rock can be controlled by the meticulous design and construction as well as reliable safety technology measures under the condition of no cover when urban road-cut excavation blasting is carried out in the complex environment.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

641-644

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Li Benwei, Chen Dezhi, Zhang Ping, Kang Song, Li Kefei: Blasting demolition of 180m-high reinforced concrete chimney [J]. Blasting, 2011, 26 (4), p.41~45.

Google Scholar

[2] Chen Dezhi, Ding Bangqin: Directional blasting and vibration testing of 100m-high reinforced concrete chimney under harsh conditions. Engineering Blasting 2003, 9 (2), p.33~35.

Google Scholar

[3] Chen Dezhi, Ding Bangqin: Blasting demolition of 90m-high reinforced concrete chimney. Blasting 2007, 24 (4), p.49~52.

Google Scholar

[4] Chen Dezhi: Directional blasting demolition technology of 120m-high chimney under complex conditions. Journal of Wuhan University of Science and Technology 2008, 31, p.33~36.

Google Scholar