p.606
p.610
p.614
p.618
p.622
p.626
p.629
p.634
p.641
Controllable Blasting Technology of Urban Road-Cut Excavation Project under 220kV Super-Voltage Transmission Line
Abstract:
There are 220kV super-voltage transmission lines and electrification line above the road-cut excavation blasting project, which is near the buildings, the blasting vibration and fly-rocks shall be strictly controlled, thus the blasting design and construction are difficult. This paper describes the controllable blasting technology design of the road-cut excavation in the complex environment, the blasting parameter selection, the detonating network and the safety technology. Practice has proved that the blasting vibration and individual fly-rock can be controlled by the meticulous design and construction as well as reliable safety technology measures under the condition of no cover when urban road-cut excavation blasting is carried out in the complex environment.
Info:
Periodical:
Pages:
641-644
Citation:
Online since:
August 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: