Authors: Jing Ping Liao, Chun Jie Wang
Abstract: According to the structure and environment of the spacecrafts, its necessary to have mechanical experiments on them. Besides, analysis models are also required. The combination of experiments and analysis is useful. Analysis can guide experiments ,which will lead to improve the accuracy of experiments. At the same time, the experiment data can be used to update the models. Nowadays, analysis softwares are lack of capacity in post-processing, and they cant complete the task of contrasting analysis and experiment data. This paper designs a system which is based on MSC.Patran , Oracle and Java to solve that problem.
269
Authors: Xia Peng, Ping Zhu
Abstract: The storage management system manages and controls for storage in-out stock activities, and has an important significance for coordinating production and operation of enterprise, improving economic efficiency. Requirement analysis is the basis of software development, mainly is functional requirement analysis and performance requirement analysis. First, do the functional requirement analysis, through analysis the business processes, analysis the main functions and processes of system with data flow diagram, and list the buyer, purchase commodity information, sales production, commodity stock table and data dictionary item. Then, do performance requirement analysis; describe the main content of the three aspects of accuracy, time characteristics and flexibility, especially analysis the C/S structure model to build software systems. In this paper, describes the overall concept of software function and performance as the specific software requirement specification, lays a foundation for the development of storage management system.
1438
Abstract: Coal’s production and business plan is the core business of the whole plan which reflects the business development strategy and general policy of production and operation. Based on the detailed analysis of the production and business plan’s development, approval, implementation and other basic work flow, author choose the software architecture which is based on B / S three-tier to develop the coal’s production and business planning management system, it achieves a set of basic information, planning, data management, reporting and management functions for the integrated management application platform and the timely updates and remote data sharing between various units Coal Company, improves the management level of production and operation plans.
1153
Authors: Jing Dong, Xin Wan, Wei Yue Zhou, Peng Jin
Abstract: Situation county business system construction is in-depth analyzed in this article. The communication network constraints,lack of standards and operational system is not unified planning are pointed, cannot achieve system integration and sharing of data between departments and efficient coordination office problems. Especially the construction of "Three-Five" new system breaks the pattern of the original business case of rural power management, resulting in multi-disciplinary system efficiency is not high, the accuracy and reliability of system data are reduced and other issues. This paper proposes a stable and efficient communication network in support of the construction of county power production business operations integration platform to achieve business integration applications. The system can provide support services for marketing, production, operations.
1077