Problem Analysis and Treatment Based on Condensate Polishing System in 600MW Unit of Power Plant

Article Preview

Abstract:

Various feasible solutions were proposed to solve the problems of debugging condensate polishing system in 600MW unit of Power Plant, such as unsuitable hydraulic test, poor effect of resin regeneration, imperfect program control interlock protection and so on, which ensured safe and steady operation of whole system.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 805-806)

Pages:

1198-1201

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xiaofei Yang, Jintang Hao, Junling Wang. An Initial Analysis on the Regeneration process of Condensate Polishing Mixed Bed [J]. Shanxi Electric Power, Vol. 2(2010), pp.47-50(In Chinese).

Google Scholar

[2] A.L. Wang C.Y. Zhang, Y.Q. Yang L.L. Yin. Condensate Polishing System for PWR Nuclear Power Plant[J]. Journal of Energy and Power Engineering, Vol. 5(2011), pp.999-1004.

Google Scholar

[3] Rui Li, Shide He, Zhanmei Zhang. Condensate Polishing Treatment Status and Application of New Technologies[J]. Electric Power Environmental protection, Vol. 25(2009), pp.45-47.

Google Scholar

[4] Feng Pei, Xiaoyan Shi. Discussion on Tower Separation and Regeneration Technology for Condensate Fine Treatment[J]. North China Electric Power, Vol. 4(2010), pp.13-16(In Chinese).

Google Scholar

[5] Shi Xaioyan, Zou Xin, Pei Feng. Analyzing and Discussing High Tower Separation and Regeneration of Debugging Power Plant Polishing System [J]. Cleaning World, Vol. 26(2010), pp.20-23(In Chinese).

Google Scholar

[6] Jiangxin Huang. Summary of External Regeneration &Separation Technique for Condensate Polishing System [J]. Power Station Auxiliary Equipment, Vol. 90(2004), pp.31-36(In Chinese).

Google Scholar

[7] Yanning Gao, Xiao Long, Hantao Ren. Air Cooling Unit of Powdered Resin Precoat Filter Debugging Points Analysis [J]. Applied Energy Technology, Vol. 9(2011), pp.45-47(In Chinese).

Google Scholar

[8] Changhai Li. Condensate Polishing System Commissioning in Power Plant [J]. Electric Power, Vol. 43(2010), pp.69-73(In Chinese).

Google Scholar

[9] Xiaojun Sun, Xiaopang Wang, Tiejia Guo. Comparison and Selection of Condensate Polishing System Resin Regeneration Mode[J]. Hebei Electric Power, Vol. 29(2010), pp.49-51(In Chinese).

Google Scholar

[10] Qi Xu, Xiangdong Yang, Guoling Sun. DCS Application in Chemical water treatment of Power Plant[J]. Electric power, Vol. 38(2005), pp.61-63(In Chinese).

Google Scholar

[11] Yinchu Kong, Debugging the System of Refined Treating Congeals Water Processing in Power Plant[J]. Cleaning World, Vol. 21(2005), pp.17-23(In Chinese).

Google Scholar

[12] Fuli Zhang, Jingxiang Xie. Rational Option of Condensate Polishing System [J]. Electric Power, Vol. 34(2001), pp.17-19(In Chinese).

Google Scholar