Construction Ventilation of Tongluoshan Expressway Tunnel
Abstract:
Tongluoshan expressway tunnel passes through coal mined out area. It is an extra-long expressway tunnel with high-gas, so construction ventilation is the key in this project. Combined with the theoretical calculation and the actual situation of Tongluoshan Tunnel, the forced ventilation is taken as the major way of construction ventilation. Based on the calculation of required airflow, gas distribution in work area and calculation of air duct resistance and tunnel resistance, the configuration of fans is optimized, thus the construction ventilation of each section have been determined.
Info:
Periodical:
Pages:
1234-1239
Citation:
Online since:
November 2013