Research on the Interaction Relation of the Causations of Tunnel Collapse Accident

Article Preview

Abstract:

The purpose of this study is to find the key factors influencing the tunnel collapse accident, and explore the causal relationships between the causations of the tunnel collapse accident. Based on document surveys and Delphi Method, a system of the causation indicators of the collapse accident is established. In order to make sure that the hierarchy structure of the causation index system of the tunnel collapse accident is illustrative and reasonable, a new method of system structure analysis is proposed based on the integration of Decision making trial and evaluation laboratory (DEMATEL) and Interpretive structure model (ISM). Applying this method, the center degree and the reasoning degree of the causation are obtained firstly, and then the system hierarchy structure of the causation index system of the tunnel collapse accident is actualized. The results showed that the main causes of the tunnel collapse accident are derived from management. This research reveals the interaction relations of the causations of tunnel collapse accident, based on which this research also provides strong theory and methods to support dynamic decision and quantitative risk assessment in tunnel construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 838-841)

Pages:

1414-1419

Citation:

Online since:

November 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Sturk, R., Olsson, L., Johansson, J., 1996. Risk and decision analysis for large underground projects, as applied to the Stockholm Ring Road tunnels. Tunnell. Underground Space Technol. 11 (2), 157–164.

DOI: 10.1016/0886-7798(96)00019-3

Google Scholar

[2] Sander, P., Spiegl, M., Schneider, E., 2009. Risk management for large infrastructure projects using probabilistic methods. In: Proceedings of the ITA-AITES World Tunnel Congress 2009, Budapest, Hungary.

Google Scholar

[3] Yan, J., Ye, S., 2009. Risk evaluation and control of Yesanguan railway tunnel on Yiwan railway line, China. In: Proceedings of the ITA-AITES World Tunnel Congress 2009, Budapest, Hungary.

Google Scholar

[4] Sousa, R.L., 2010. Risk Analysis for Tunneling Projects. PhD Thesis, Massachusetts Institute of Technology.

Google Scholar

[5] PIARC, 2007. Integrated Approach to Road Tunnel Safety. PIARC, La Defense.

Google Scholar

[6] PIARC, 2008. Risk Analysis for Road Tunnels. PIARC, La Defense.

Google Scholar

[7] Zhou dequn, Zhang Lin. Establishing hierarchy structure in complex systems based on the integration of DEMATEL and ISM[J]. JOURNAL OF MANAGEMENT SCIENCES IN CHINA, 2008, 11(2): 20-26, In Chinese.

Google Scholar

[8] Li minghui, Xia jingbo, Chen caiqiang, Yin bo, Wang kai. A new system structure analysis arithmetic with reachable effect factor [J]. Transactions of Beijing institute of technology, 2012, 32(2): 135-140, In Chinese.

Google Scholar